Introduction

All about the Edgewood Neighborhood of Washington, DC

Questions/Comments/Story Ideas - email me at lifeontheedgewood@gmail.com





Showing posts with label Rhode Island Row. Show all posts
Showing posts with label Rhode Island Row. Show all posts

Thursday, January 8, 2015

Phenix Salon Suites at Rhode Island Row



See the press release below about the new Phenix Salon Suites at Rhode Island Row.

MEDIA ALERT

Date: December 19, 2014

What: Rhode Island Row, a mixed-use development in Northeast DC, has announced Phenix Salon Suites is now open. Phenix brings a first-of-its-kind concept to Washington, DC, which features more than 35 independent business environments (salon suites), featuring hair stylists, professional makeup services, estheticians and more. Each suite is controlled by the salon professional, providing the local community with a diverse offering of dozens of services within one environment. 

Phenix is located between next to TKO Burger at Rhode Island Row, and is easily accessible via the red line at the Rhode Island Avenue metro station. 

Where:             Rhode Island Row, 2300 Washington Place NE, Washington, DC 20018

Hours:             Hours are determined by individual stylists.

Info:                 http://www.rhodeislandrow.com/retail/    

About Rhode Island Row:

Rhode Island Row is a mixed-use, transit-oriented development featuring 274 residential apartment units and 70,000 feet of ground-level retail space. Located at the Red Line’s Rhode Island Avenue-Brentwood Metrorail station in northeast Washington, DC, Rhode Island Row is home to national retail tenants such as CVS, Chipotle and Jersey Mike’s as well as local merchants Bergami’s Pizza, Carolina Kitchen, and Sala Thai. The apartments at Rhode Island Row offer spacious one, two, and three bedroom floor plans with granite countertops, stainless steel appliances, and full-size washers and dryers. Community amenities include a fitness center, resort-style outdoor pool, garage parking, bicycle storage, and a 7,000 square-foot green roof deck. Rhode Island Row is proudly managed by Bozzuto Management Company. For more information, please visit www.rhodeislandrow.com

Thursday, October 16, 2014

First Screening of Digitally Remastered "Halloween (1978)" on Oct 25


Rhode Island Row, in DC’s Brentwood neighborhood, will be the first venue to screen the digitally remastered “Halloween (1978)” film on a 20-foot outdoor jumbo screen on Saturday, October 25th at 7 pm. This version has never before been available to the public. More details are attached and found here: https://www.facebook.com/events/1474993732789773/.

The event will feature an outdoor beer garden and food by Bergami’s Pizza. This event is 21 and over.

Thursday, July 10, 2014

Development Update

Just a glance around Edgewood and you can see all the ongoing construction with developments completing and new neighbors and businesses moving into the neighborhood. I feel like a broken record trying to get these developments to acknowledge that they are in Edgewood! So below are the updates of the developments ongoing in the Edgewood neighborhood for your reading pleasure.

Chancellor's Row (3015 4th Street NE) - 10-acre residential development on St. Paul's campus which began construction Fall 2010 as promised and already has residents living there. They only have four houses left to sell and will definitely sell out this year if not this month. It is anticipated that all three phases will be completed ahead of schedule as sales are going so well and prices keep going up. They have already added a ZipCar and a Capital Bikeshare Station to this location. The remodeling of the triangle park at 4th, Franklin and Lincoln NE has been completed from the community benefits of this project.

Monroe Street Market (7th Street and Michigan Ave NE) - mixed use development will include approximately 720 housing units, 45 townhouses, and a public square with a college main street with 83,000 square feet of street-level retail, 15,000 square feet of artists' studio space and 850 below-grade parking spaces. They started demolition on the CUA buildings in 2010 and broke ground on November 9, 2011. Right now they are getting close to completion with their 3 buildings renting and the Arts Walk full.  They have retail open- &Pizza, Potbelly and more is coming.  Brookland Pint and Barnes & Noble are scheduled to open Summer 2014.  Filter Coffeehouse and The Bike Rack scheduled to open Fall 2014. Busboys and Poets is scheduled to open Winter 2014/2015.  They have a future phase that is still to be planned and developed and they will neither confirm nor deny that it could hold a Whole Foods in the future when it is developed.

Pizza Mart Development (4th Street and Adams Street NE) - recently the building that houses the Pizza Mart has sold and it will be demolished.  It has already been closed and emptied.  They have applied for permits and the realtor stated that it will be condos with ground floor retail.

H Street Development Corporation (2313-2331 4th Street NE) - this development has been long stalled but is supposed to be affordable housing apartments with ground floor retail.  They have done the soil testing but it has been otherwise quiet.  It has been noted that the liquor store next door to it has closed and its space may now be included in this project.

Chez Hareg Catering (2314 4th Street NE) - the pastry shop is getting ready to reopen as a cafe serving breakfast and lunch.  They have a menu posted on their window that looks delicious and affordable.

Developments Surrounding Edgewood

Rhode Island Row (919 Rhode Island Ave NE) - This project is well underway and already has residents moving in as the apartments are completed. They have posted the rents and they range from $1740 for a 1 bed/bath to $3465 for a 3 bed/bath. This place has already rented out over 95% of their apartments. The reatil is starting to fill in and as of now the following are open: CVS, Chipotle, Sprint, T-Mobile, DC Dept. of Motor Vehicles, Carolina Kitchen, TK Burger, D’Arte Nail & Spa Salon, Jersey Mike's, Bergami's Pizza, and Sala Thai. Phenix Hair Salon Suites is set to open this fall.  They still have open spaces left and I am hoping that they will fill them soon!!

Mint Condos (329 Rhode Island Ave NE) - This project is completed and is across the street from Edgewood in Eckington. The burnt out shell of a building was converted into 21 luxury condos priced between mid $250,000 and mid $300,000s and  sold out. The building also has 3000 square feet of retail space which is now Mint Dental- a great neighborhood amenity to walk to a dental office.

901 Monroe Street NE - This project was approved by the zoning commission across the street in Brookland and looks promising. The plans are after demolishing the current buildings to build 212 Apartments, 16 units at below market rents, and 13,000 sq. ft. of neighborhood-serving retail including a restaurant. Groundbreaking occurred the end of 2012, but there have not been many updates since then. It was supposed to be done by Fall of 2013, so seems to be a bit behind schedule.

Washington Gateway (Intersection of New York Ave and Florida Ave NE) - This project which has been recently revived and modified to include more residential instead of a hotel will connect NoMa with the Eckington neighborhood. The groundbreaking happened the end of last year for Phase One which is a building with 400 residential units and 5,200 sq. ft. of retail and is well on its way to being completed with a restaurant taking the retail space.  The next two phases of this project will be office buildings. This project will also connect to the Met Branch Trail which will be great.

McMillan Sand Filtration (North Capitol Street, Michigan Ave, 1 Street NW) - This huge 25 acre site has been the focus of many meetings and plans over the years and I'll put its timeline as I'll believe it when I see it. The site is now being used to storm excess storm water to help reduce flooding in the area. There are many sites and posts about this development as everyone seems to have an opinion as to what should happen with this piece of land. They have recently had meetings with the zoning board and historic preservation and there have been more meetings so I am sticking to my last update that I will believe it when I see it. 

Wednesday, February 6, 2013

Development Update

Just a glance around Edgewood and you can see all the ongoing construction with developments completing and new neighbors and businesses moving into the neighborhood. I feel like a broken record trying to get these developments to acknowledge that they are in Edgewood! So below are the updates of the developments ongoing in the Edgewood neighborhood for your reading pleasure.

Chancellor's Row (3015 4th Street NE) - 10-acre residential development on St. Paul's campus which began construction Fall 2010 as promised and already has residents living there. They have sold all 100 houses in Phase I and they are all completed and occupied. Phase 2 started in April and is currently open for sales and has been selling fast. It is anticipated that all three phases will be completed ahead of schedule as sales are going so well and prices keep going up. They have already added a ZipCar to this location and they are supposed to be adding a Capital Bikeshare Station this Spring. The remodeling of the triangle park at 4th, Franklin and Lincoln NE has been completed from the community benefits of this project.

Monroe Street Market (formerly CUA South Campus Development) (7th Street and Michigan Ave NE) - mixed use development will include approximately 720 housing units, 45 townhouses, and a public square with a college main street with 83,000 square feet of street-level retail, 15,000 square feet of artists' studio space and 850 below-grade parking spaces. They started demolition on the CUA buildings in 2010 and broke ground on November 9, 2011. The first phase of 562 residential units is scheduled to be completed in Summer 2013. The construction is moving ahead as you can already see foundations poured and vertical structures have already been constructed. They have started working on the interiors of some parts of the project and a pre-leasing trailer has been added. There will also be improvements made to the sidewalks, crosswalks and Met Branch Trail connection in that area.

Developments Surrounding Edgewood

Rhode Island Row (919 Rhode Island Ave NE) - This project is well underway and already has residents moving in as the apartments are completed. They have posted the rents and they range from $1740 for a 1 bed/bath to $3465 for a 3 bed/bath. This place has already rented out over 95% of their apartments. The retail is still being kept quiet. I have heard that Five Guys, Dunkin Donuts, and Starbucks are going to open over there, but they have not been confirmed. I have also heard that some of the restaurants over on H Street have been checking out the space to open a second location. I really hope that rumor is true!!!The CVS is already open on the corner retail slot on Rhode Island Avenue NE. Opening First Quarter 2013: Chipotle, Sprint, T-Mobile, DC Dept. of Motor Vehicles.  Opening Summer 2013: Carolina Kitchen, CK Burger, D’Arte Nail & Spa Salon, and Sala Thai.  Both Carolina Kitchen and Sala Thai have applied for liquor licenses and will have live music entertainment on the weekends.  Carolina Kitchen will have outdoor seating as well.  This development is also supposed to add a Capital Bikeshare Station this Spring.

Mint Condos (329 Rhode Island Ave NE) - This project is completed and is across the street from Edgewood in Eckington. The burnt out shell of a building was converted into 21 luxury condos priced between mid $250,000 and mid $300,000s and have already sold out. The building also has 3000 square feet of retail space and is currently selling.
901 Monroe Street NE - This project was recently approved by the zoning commission across the street in Brookland and looks promising. The plans are to demolish the current buildings and build 212 Apartments, 16 units at below market rents, and 13,000 sq. ft. of neighborhood-serving retail including a restaurant.  Groundbreaking occurred the end of 2012, but there have not been many updates since then.  It was supposed to be done by Fall of 2013, but seems to be a bit behind schedule. 

Washington Gateway (Intersection of New York Ave and Florida Ave NE) - This project which has been recently revived and modified to include more residential instead of a hotel will connect NoMa with the Eckington neighborhood. A huge empty 3 acre lot will be transformed into office space and residential with a 15,000 sq. ft. retail component. There will be improvements made to the Met Branch Trail which will connect to this development. The groundbreaking happened the end of last year for Phase One which is a building with 400 residential units and 5,200 sq. ft. of retail.

Trilogy NoMa (Formerly NoMa West) (Eckington Place and Q Street NE) - This development broke ground in March 2011 and looks to be pretty much completed. There are three buildings and a small amount of retail. There is an extension of Q street, a pedestrian walkway and connection with the Met Branch Trail included in the project. Apartments are renting for the studios from $1673 to 2 bedrooms with den at $3323.

McMillan Sand Filtration (North Capitol Street, Michigan Ave, 1 Street NW) - This huge 25 acre site has been the focus of many meetings and plans over the years and I'll put its timeline as I'll believe it when I see it. The site is now being used to storm excess storm water to help reduce flooding in the area. There are many sites and posts about this development as everyone seems to have an opinion as to what should happen with this piece of land. They have recently filed a draft PUD and there have been more meetings so I am sticking to my last update that I will believe it when I see it.

Monday, July 2, 2012

Development Update

Just a glance around Edgewood and you can see all the ongoing construction with developments completing and new neighbors and businesses moving into the neighborhood. I feel like a broken record trying to get these developments to acknowledge that they are in Edgewood! So below are the updates of the developments ongoing in the Edgewood neighborhood for your reading pleasure.

Chancellor's Row (3015 4th Street NE) - 10-acre residential development on St. Paul's campus which began construction Fall 2010 as promised and already has residents living there. They have sold all 100 houses in Phase I and they are all completed and occupied. Phase 2 started in April and is currently open for sales having already sold 47 houses. It is anticipated that all three phases will be completed ahead of schedule as sales are going so well.  They have already added a ZipCar to this location and they are supposed to be adding a Capital Bikeshare Station as well.  The Brookland Heartbeat did a recent writeup of the status of the community benefits that have been completed and will be coming with this project.

Monroe Street Market (formerly CUA South Campus Development) (7th Street and Michigan Ave NE) - mixed use development will include approximately 720 housing units, 45 townhouses, and a public square with a college main street with 83,000 square feet of street-level retail, 15,000 square feet of artists' studio space and 850 below-grade parking spaces. They started demolition on the CUA buildings in 2010 and broke ground on November 9, 2011. The first phase of 562 residential units is scheduled to be completed in Summer 2013. The construction is moving ahead as you can already see foundations poured and vertical structures have already been constructed.  There will also be improvements made to the sidewalks, crosswalks and Met Branch Trail connection in that area.

Brookland Artspace Lofts (3225 Eighth Street NE) - 41 live/work rental units directly adjacent to Dance Place's HQ and studio space for qualified DC artists making 60% or less of the area median income construction began Spring 2010 and is completed and at 100% occupancy now. They are accepting applications for their waitlist.

Developments Surrounding Edgewood

Rhode Island Row (919 Rhode Island Ave NE) - This project is well underway and already has residents moving in as the apartments are completed. They have posted the rents and they range from $1740 for a 1 bed/bath to $3465 for a 3 bed/bath. This place has already rented out over 60% of their apartments.  The retail is still being kept quiet with only the CVS, Carolina Kitchen, DMV and Chipotle confirmed.  I have heard that Five Guys, Dunkin Donuts, and Starbucks are going to open over there, but they have not been confirmed. I have also heard that some of the restaurants over on H Street have been checking out the space to open a second location.  I really hope that rumor is true!!!The CVS is already open on the corner retail slot on Rhode Island Avenue NE. This development is also supposed to add a Capital Bikeshare Station.

Mint Condos (329 Rhode Island Ave NE) - This project is completed and is across the street from Edgewood in Eckington. The burnt out shell of a building was converted into 21 luxury condos priced between mid $250,000 and mid $300,000. The building also has 3000 square feet of retail space and is currently selling. The last I heard they had 11 condos already under contract.

901 Monroe Street NE - This project was recently approved by the zoning commission across the street in Brookland and looks promising. The plans are to demolish the current buildings and build 212 Apartments, 16 units at below market rents, and 13,000 sq. ft. of neighborhood-serving retail including a restaurant. Groundbreaking is scheduled for Fall 2012.

Washington Gateway (Intersection of New York Ave and Florida Ave NE) - This project which has been recently revived and modified to include more residential instead of a hotel will connect NoMa with the Eckington neighborhood. A huge empty 3 acre lot will be transformed into office space and residential with a small retail component. There will be improvements made to the Met Branch Trail which will connect to this development. The groundbreaking is supposed to happen before the end of the year for Phase One which is a building with 400 residential units and 5,200 sq. ft. of retail.

NoMa West (Eckington Place and Q Street NE) - This development broke ground in March 2011 and they have been hard at work with construction ever since. There will be a total of three buildings when they are completed and a small amount of retail. There will be an extension of Q street, a pedestrian walkway and connection with the Met Branch Trail included in the project. Apartments are scheduled to be available starting in Fall 2012.

McMillan Sand Filtration (North Capitol Street, Michigan Ave, 1 Street NW) - This huge 25 acre site has been the focus of many meetings and plans over the years and I'll put its timeline as I'll believe it when I see it. The current plans call for mixed-use development and park space which I think would be amazing! There are many sites and posts about this development as everyone seems to have an opinion as to what should happen with this piece of land. They have recently filed a draft PUD and there have been more meetings so I am sticking to my last update that I will believe it when I see it.

Monday, March 19, 2012

Edgewood Development Update

Just a glance around Edgewood and you can see all the ongoing construction with developments completing and new neighbors and businesses moving into the neighborhood.  I feel like a broken record trying to get these developments to acknowledge that they are in Edgewood! So below are the updates of the developments ongoing in the Edgewood neighborhood for your reading pleasure.

Chancellor's Row (3015 4th Street NE) - 10-acre residential development on St. Paul's campus which began construction Fall 2010 as promised and already has residents living there. They have sold all 100 houses in Phase I and they will all be complete and occupied by May. Phase 2 starts construction in April and is currently open for sales having already sold 29 houses.  They have already added a ZipCar to this location and they are supposed to be adding a Capital Bikeshare Station as well.


Monroe Street Market (formerly CUA South Campus Development) (7th Street and Michigan Ave NE) - mixed use development will include approximately 720 housing units, 45 townhouses, and a public square with a college main street with 83,000 square feet of street-level retail, 15,000 square feet of artists' studio space and 850 below-grade parking spaces. They started demolition on the CUA buildings in 2010 and broke ground on November 9, 2011. The first phase of 562 residential units is scheduled to be completed in Summer 2013. There will also be improvements made to the sidewalks, crosswalks and Met Branch Trail connection in that area.

Brookland Artspace Lofts (3225 Eighth Street NE) - 41 live/work rental units directly adjacent to Dance Place's HQ and studio space for qualified DC artists making 60% or less of the area median income construction began Spring 2010 and is completed and at 100% occupancy now. They are accepting applications for their wait list.

Developments Surrounding Edgewood

Rhode Island Row (919 Rhode Island Ave NE) - This project is well underway and already has residents moving in as the apartments are completed. They have posted the rents and they range from $1740 for a 1 bed/bath to $3465 for a 3 bed/bath. The retail is still being kept pretty hushed even though it was supposed to be anounced the end of last year and open Spring 2012 it is rumored to have over 60% of the space "spoken for". I have only heard that CVS, Five Guys, Dunkin Donuts, DMV and Sprint are going to open over there.  The CVS "coming soon" sign is up on the corner retail slot on Rhode Island Avenue NE.  This development is also supposed to add a Capital Bikeshare Station. 


Mint Condos (329 Rhode Island Ave NE) - This project is currently underway and is across the street from Edgewood in Eckington. The burnt out shell of a building is being converted into 24 luxury condos priced between mid $250,000 and mid $300,000. The building is also supposed to include five retail units and is currently selling. The last I heard they had 4 condos already under contract. They are close to being finished and it looks great with the new fence and landscaping.

901 Monroe Street NE - This project was recently approved by the zoning commission across the street in Brookland and looks promising. The plans are to demolish the current buildings and build 212 Apartments, 16 units at below market rents, and 13,000 sq. ft. of neighborhood-serving retail including a restaurant. Groundbreaking is scheduled for Fall 2012. 

Washington Gateway (Intersection of New York Ave and Florida Ave NE) - This project which has been recently revived and modified to include more residential instead of a hotel will connect NoMa with the Eckington neighborhood. A huge empty 3 acre lot will be transformed into office space and residential with a small retail component. There will be improvements made to the Met Branch Trail which will connect to this development. The groundbreaking is supposed to happen before the end of the year for Phase One which is a building with 400 residential units and 5,200 sq. ft. of retail.

NoMa West (Eckington Place and Q Street NE) - This development broke ground in March 2011 and they have been hard at work with construction ever since. There will be a total of three buildings when they are completed and a small amount of retail. There will be an extension of Q street, a pedestrian walkway and connection with the Met Branch Trail included in the project.  Apartments are scheduled to be available starting in Fall 2012.

McMillan Sand Filtration (North Capitol Street, Michigan Ave, 1 Street NW) - This huge 25 acre site has been the focus of many meetings and plans over the years and I'll put its timeline as I'll believe it when I see it. The current plans call for mixed-use development and park space which I think would be amazing! There are many sites and posts about this development as everyone seems to have an opinion as to what should happen with this piece of land. They have recently filed a draft PUD and there have been more meetings so I am sticking to my last update that I will believe it when I see it.

Saturday, January 21, 2012

Recap of the Rhode Island Avenue Task Force Meeting

This morning I attended the Rhode Island Avenue Task Force meeting and I wanted to share what  I learned as it pertains to Edgewood.  Also,  I would like to encourage people to attend these meetings as they are open to the whole community and it is a great way to get your voice heard and be a part of the development of Rhode Island Avenue NE.  The next meeting is being scheduled for the end of February.

The meeting started with an introduction of the different groups that were present.  There was quite a bit of blunt expression demonstrating the fractured relationship by the Premier CDC group towards the Friends of Rhode Island Ave group.  I have experience with the Premier CDC group in regards to them working towards starting an Edgewood Farmer's Market and I joined the Friends of Rhode Island Avenue group when they started last year.  So, that said I am not going to go into details of the discussion I am going to say I think both groups have a niche and there is so much to be done that the more the merrier.  I just hope people can work together and not duplicate efforts.  I think it would be best if each group could focus on specific initiatives and the Task Force meetings could be used to delegate and discusss what each group is doing.

There was a representative from CM Orange's office there and Jeff Miller, Director of Real Estate from the Office of the Deputy Mayor for Planning and Economic Development was there as well.  They were both very informative about programs and initiatives and honest about the lack of money for government funding for many of these items.

I asked many questions about the potential Farmer's Market in Edgewood.  Premier CDC group stated that they are still working on it hoping to start one this year.  They have been talking with Vanguard at the Rhode Island Shopping Center, but they still do not have anything signed.  Jeff Miller stated that his office has also been discussing it with Vanguard and also offered the option that the Rhode Island Row development would be happy to have the Farmer's Market there.  It seems that we may very well have one this year.

Jeff Miller also stated that over 50% of the Rhode Island Row development's retail has already been leased.  He did not share any new tenants past the ones we already know.  I am hoping that Rhode Island Row will start advertising who they are as their spaces are being completed.

The Rhode Island Shopping Center was discussed further as I asked a few more questions about it and was told that development may be closer than I was previously told.  Basically the leases being signed by the new discount grocer/retailer are going to be shorter term and redevelopment could happen in pieces.

I made a few connections at the meeting for an outdoor movie night that I am trying to plan and coordinate with multiple groups along Rhode Island Avenue.  If anyone is interested in being involved with planning let me know!

Thursday, January 5, 2012

Row Island Row Update

Since my sources were right about the CVS and these retailers make sense I am sharing the new list of tenants for Rhode Island Row.

CVS
DMV
Dunkin Donuts
Five Guys
Sprint

Here's hoping something more local and sit-down joins them soon!!

Friday, November 11, 2011

Edgewood Development Update



On Tuesday they broke ground on the CUA South Campus Development now named the Monroe Street Market.  Again all over the media and neighborhoods people have been calling it Brookland's new development.  I feel like a broken record trying to get these developments to acknowledge that they are in Edgewood!  So below are the updates of the developments ongoing in the Edgewood neighborhood for your reading pleasure.

Chancellor's Row (3015 4th Street NE) - 10-acre residential development on St. Paul's campus which began construction Fall 2010 as promised and already has residents living there. They have sold 91 houses as of September 23, 2011. Phase 2 is currently open for sales.  Their prices have risen seven percent since opening in 2010.  They are building a total of 237 new townhouses in this development and the speed at which they build will depend on sales. At the current rate of sale I imagine they will be building pretty fast and with all the other developments in the area may sell out sooner than they expected.

Monroe Street Market (formerly CUA South Campus Development) (7th Street and Michigan Ave NE) - mixed use development will include approximately 720 housing units, 45 townhouses, and a public square with a college main street with 83,000 square feet of street-level retail, 15,000 square feet of artists' studio space and 850 below-grade parking spaces. They started demolition on the CUA buildings last year and broke ground on November 9, 2011.  The first phase of 562 residential units is scheduled to be completed in Summer 2013.  There will also be improvements made to the sidewalks, crosswalks and Met Branch Trail connection in that area.

Brookland Artspace Lofts (3225 Eighth Street NE) - 41 live/work rental units directly adjacent to Dance Place's HQ and studio space for qualified DC artists making 60% or less of the area median income construction began Spring 2010 and is completed and at 100% occupancy now.  They are accepting applications for their wait list.

Developments Surrounding Edgewood

Rhode Island Row (919 Rhode Island Ave NE) - This project is well underway and should have residents moving in in waves as the apartments are completed.  They have posted the rents and they range from $1630 for a 1 bed/bath to $3500 for a 3 bed/bath.  The retail is supposed to be announced the end of this year and open Spring 2012.  I have only heard that CVS is going to open over there. 

Mint Condos (329 Rhode Island Ave NE) - This project is currently underway and is across the street from Edgewood in Eckington. The burnt out shell of a building is being converted into 20 luxury condos priced between $200,000 and $300,000. The building is also supposed to include five retail units and was scheduled for completion in Spring 2011.  They have been painting the building and it looks to be well underway with renovations.  I am not sure when they plan to have it move in ready or announce retail.  They have updated their website.

901 Monroe Street NE - This project is just entering the planning stages across the street in Brookland, but looks promising. The plans are to demolish the current buildings and build 212 Apartments, 16 units at below market rents, and 13,000 sq. ft. of neighborhood-serving retail including a restaurant. Groundbreaking is scheduled for Spring 2012.  The zoning commission public hearing is scheduled for January 19, 2012.

Washington Gateway (Intersection of New York Ave and Florida Ave NE) - This project which has been recently revived and perhaps modified to include more residential instead of a hotel will connect NoMa with the Eckington neighborhood. A huge empty 3 acre lot will be transformed into office space and residential with a small retail component. There will be improvements made to the Met Branch Trail which will connect to this development. The groundbreaking is supposed to happen before the end of the year for Phase One which is a building with 400 residential units and 5,200 sq. ft. of retail.. 

NoMa West (Eckington Place and Q Street NE) - This development broke ground in March 2011 and they have been hard at work with construction every since.  There will be a total of three buildings when they are completed and a small amount of retail.  There will be an extension of Q street, a pedestrian walkway and connection with the Met Branch Trail included in the project. 

McMillan Sand Filtration (North Capitol Street, Michigan Ave, 1 Street NW) - This huge 25 acre site has been the focus of many meetings and plans over the years and I'll put its timeline as I'll believe it when I see it. The current plans call for mixed-use development and park space which I think would be amazing! There are many sites and posts about this development as everyone seems to have an opinion as to what should happen with this piece of land.   They have recently filed a draft PUD and there have been more meetings so I am sticking to my last update that I will believe it when I see it.

Monday, July 18, 2011

Rhode Island Row Update

First Phase of Rhode Island Row Ready For Occupancy in October


http://dc.urbanturf.com/articles/blog/first_phase_of_rhode_island_row_ready_for_occupancy_in_october/3795

First Phase of Rhode Island Row Ready For Occupancy in October
July 13, 2011
5 Comments
by Andrew Siddons

Rhode Island Row

If you've driven on Rhode Island Avenue over the last year or so, you may have noticed that sprawling parking lots near the Rhode Island Avenue-Brentwood Metro station have given way to construction sites, which are nearly looking like places where people might live and shop one day.

UrbanTurf recently spoke to Vicki Davis, president of Urban-Atlantic, who is developing the Rhode Island Row project, a large mixed-use project at 919 Rhode Island Avenue NE next to the Red Line station. Davis said that starting in October, the first of the project's 274 rental units will be ready for occupancy, and that potential tenants will be able to start looking at apartments in mid-August.

"We are planning on having our leasing staff start temporarily on site starting then," she said. "We'll be doing pre-marketing and hard-hat tours."

Split between two buildings (north and south), the apartments will be delivered in 30 to 40-unit phases, with subsequent deliveries scheduled for December, January, and March. (All of the units are expected to deliver by Summer 2013.) The first apartments will be in the north building located on Rhode Island Avenue, twenty percent of which will be offered at below market rates.

Rendering of completed Rhode Island Row.

The two buildings will also have 70,000 square feet of retail between them, although the first establishments won't open until next March. For now, Urban-Atlantic is staying mum about potential tenants, waiting to make an announcement about retail offerings until the end of the year. However, the developer has reached out to the neighborhood for retail suggestions through the Rhode Island Insider blog. If these recommendations are taken into account, there will be sit-down restaurants, a coffee shop, a grocery store, a dry cleaners, and a mix of retail other than clothing and shoe stores.

In between the project's two buildings will be a road with three lanes of street parking, a pedestrian median, and sidewalk fronting retail. This section will include 42 parallel parking spaces, that will add to the north building's 168 public parking spots. (A new 212-space Metro parking garage is also scheduled to open in August.) The north building's garage will also include a public electric-car charging station. Both residential buildings will offer green roofs, with planting boxes designed to absorb rainwater to prevent runoff and help with insulation. The north building will have a rooftop terrace with fire pits and seating areas, and the south building will include a pool and fitness center.

Thursday, June 2, 2011

ICYMI: Rhode Island Station is now Rhode Island Row

In case you missed it I have been meaning to post that Rhode Island Station has been re-branded as Rhode Island Row.  I preferred the old name, but I heard they thought it was confusing with the metro station.  The website has changed to www.rhodeislandrow.com and it is not as detailed as the previous website.  The website says that they are opening this summer and the default date on the residency inquiry is June 16th.  I don't think they will be done by then although the metro parking garage is looking very close to completion.